MAJIECO-RAIN

RAINFALL AND WASHOUT WATER PROCESSING SYSTEM

Rainfall or outwash systems are essential to control the polluting effect of rainwater. The term “rainfall” means the initial part of the collection of rainwater. Rainfall systems are dimensioned with reference to the local rainfall and meteorological coefficients.

The areas affected by rainfalls must be suitably prepared to facilitate the conveyance of the water in a single point where the rainfall system will be positioned.

More precisely, “rainfall” defines the quantities of rainwater precipitated in the first 15 minutes of the meteoric event. Such quantities are defined as a reference value which is usually 5 mm across the entire affected surface.

This water must be separated from the “subsequent rainfall” (precipitated in the following 15 minutes) and treated before the final release, as it carries the polluting elements present on the draining surface due to washout.

Example Rainfall and outwash water processing system

OPERATING PRINCIPLE

The operation of a “rainfall” tank is such that once filled, a surface spillway comes into operation, therefore all the water from that moment onwards can be introduced directly into the receiving water body or into the eventual lamination tank upstream of the receiving body.

The water accumulated in the rainfall tank is gradually sent to the black sewer system and then conveyed towards the processing plant. Refer to water quality aspects for tank dimensioning. From a regulatory point of view, rainfall water corresponds to one or more atmospheric precipitations with a total height of at least 5 mm uniformly distributed over the entire drainage surface served by the drainage network.

For the purpose of calculating the flow rates, it is established that this value occurs in 15 minutes and a runoff coefficient is assumed for impermeable areas equal to 1.

This rain water, which flows out in the initial moments of a meteoric event, are particularly charged with polluting substances since they carry out a “washing” action on the uncovered surfaces and the atmosphere, therefore they must be subjected to a specific process. Necessary information:

  1. Surface of the collection basin and type (waterproofed areas);
  2. Nature of discharges: in addition to 5 mm of rain, the discharge rates of car washes, etc.;
  3. Definition of the entry flow rates and concentrations;
  4. Definition of the limit concentrations for each pollutant that must be discharged into the sewer (Reference standard for processed discharge parameters:suspended solids, fats and mineral oils, total hydrocarbons tab. 3 annex
  5. Legislative Decree 152/06); 5. Once the inflow and concentration limits have been obtained, the rainfall tank, sand trap and the oil separator are dimensioned.

Would you like more information on rainfall and outwash water processing system ?

Request a call back from one of our consultants specialized in water treatment systems before resting and washout.

Share this product line with your collaborators